top of page
BOND UPDATES
CONSTRUCTION UPDATES
Search
Owen-Ames-Kimball Co.
Aug 11, 20211 min read
Eagle Eye Update: Freshman Campus and High School Connector
Work continues at the Hudsonville High School and Freshman Campus on the enclosed Connector that will bring these two buildings together....
674 views0 comments
Owen-Ames-Kimball Co.
Jun 15, 20211 min read
Take a Tour!
There's a lot happening on site at Hudsonville High School! Take a tour with Jeff Weber, O-A-K Project Superintendent, and Jordan Beel,...
139 views0 comments
Owen-Ames-Kimball Co.
Jun 3, 20211 min read
What will our High School look like?
Check out these architectural renderings provided by GMB Architects + Engineers, showcasing the new connector, main entry and field house...
547 views0 comments
bottom of page